L1 to L5 commissioning, integrated systems testing and black-start, N+1 and 2N proof under load: the quality gate before any readiness claim.
Scope
- Commissioning management: level 1 to level 5 planning, scripts and integrated systems testing
- Integrated systems testing and black-start
- N+1 and 2N proof under load
- Testing and commissioning, including ICA
- Inspection and test plan development, with witness and hold points
- Site inspections, quality surveillance and conformance reporting
- Defects identification and close-out through the liability period, with as-built verification at handover
In Alacris First Read, this discipline raises a desktop readiness flag at the earliest point the question is normally even asked.